by stellar | Jan 24, 2015
Project scope encompassed retrofit of the HVAC systems at eleven (11) campuses having an age of 10 years or greater, which included replacement of the following equipment: (4) water cool chillers, (1) cooling tower, (16) frequency drives, (43) rooftop units, and...
by stellar | Jan 24, 2015
Project scope includes retrofit of HVAC systems which includes replacement of six (6) air cooled chillers at Avila Elementary, De La Viña Elementary, Esparza Elementary, two (2) boilers and pumps at South Middle School, and replacement of Building Automation System...
by stellar | Jan 24, 2015
Project Scope encompassed Assessment and enhancement of the HVAC system, Upgrade of Building Automation System, which included an energy assessment. Oversight of the assessment and repairs of load bearing columns and walls, and replacement of the flooring.
by stellar | Jan 24, 2015
Project Scope included a total reconstruction of the science labs, home making, cafeteria, library, Ag Shops, new ROTC buildings, and classrooms. Improvements consisted of replacing HVAC systems and installation of new Building Automation System, replacement of...
by stellar | Jan 24, 2015
Project Scope includes design of supporting structure design and routing of chill water lines. Chiller lines running underground to the fine arts and gym areas will be demolition.